Near Zero Sulfur Diesel Hydrotreater
Completion Date
6/06
Services
Process
Mechanical
Plant Design
Scheduling Estimating
Electrical
Project Management
Procurement
Construction Management
Environmental
Industry
Refining & Chemical
Location
Mid-West
C&I developed the complete process engineering design (Front-End Engineering Design) package for this refiner?s Near Zero Sulfur Diesel Hydrotreater Project. A Pro II model of the existing facility was developed and calibrated to be used for the expansion design. This effort will allow the refiner to comply with all of the diesel sulfur regulations scheduled to go into effect and continue to produce both on-road and off-road diesel without any reduction in the refinery?s processing capacity. The feasibility (2003), detail design (2004), construction (2005), and the 2006 startup have all effectively progressed. C&I?s initial cost estimate has tracked very well through engineering, procurement, construction. The budget is currently under by 4%. Our client has commented that C&I is a true extension of their team, in which a rare synergy has been created.