Welcome to C&I:   Engineering, Procurement and Total Project Management

Projects

C&I fully respects and appreciates our client’s confidentiality arrangements and will not identify specific projects. Please refer to the Service, Industry, and Project sections for a comprehensive project catalog.

Projects are constantly being added and updated so check back often!

Thank You.

Asset Development ProjectRefinery Optimization ProjectGrass-Roots Naphtha HydrotreaterHD-5 Propane RecoveryTransmix Processing / Storage ProjectTerminal Incremental ExpansionAmine ExpansionGlobal Engineering StandardsElectrical Infrastructure UpgradeUltra Low Sulfur Grassroots Distillate HydrotreaterRefinery ShutdownOn-Line Process AnalyzersPVC Stabilizer ProductionNear Zero Sulfur Diesel HydrotreaterSulfur Recovery UnitCoker Pipe Stress AnalysisRefinery Conceptual StudiesNylon ProjectPlatform DesignFiller & Packaging ReplacementPeanut Roasting ExpansionNutritional DrinkDistillate OptimizationFruit Process Aseptic FillingGasoline Desulfurization Unit (GDU)Stranded Gas Recovery (NSPS Sub J)Boiler ConsolidationOutage PlanningSecond Point of Electrical ServiceElectrical Modeling and Infrastructure UpgradeTerminal Electrical Definition EngineeringUnit Sewer UpgradesUnderground Piping ProjectCoker Sizing and Blending FacilityCrude Unit ModelRefinery Shutdown Crude Unit UpgradeLube Vacuum Tower UpgradeAsphalt Farm ConversionWood River Terminal Electrical UpgradeRiver Logistics Dock UpgradeAlky ScrubberCO BoilersSafety Instrumented Systems (SIS) FCCU UpgradeSafety Instrumented Systems (SIS) Crude Unit ComplianceSafety Instrumented Systems (SIS) PENEX UpgradeSafety Instrumented Systems (SIS) Platformer UpgradeSafety Instrumented Systems (SIS) CO Boiler Compliance UpgradeSafety Instrumented Systems (SIS) Sulfur Recovery Unit ComplianceCoker RenovationHeavy Crude Expansion ProjectSteam Consolidation ProjectFlare Gas Recovery - Crude Unit Flare Header UpgradesBarge Loading Vapor Destruction Terminal Dock Loading UpgradeLouisville Terminal Dock Barge UpgradeCincinnati Terminal Dock EnhancementWood River Terminal Barge EngineeringC4 CavernsRefinery Grassroots Chemical Plant Incremental Expansion Phase II Conceptual for Terminals & Pipeline Global Design Standards for Nutritional Powder13.8 kV SYNC BUS ReplacementAlkyl Mitigation Upgrade16K-2 Compressor Controls UpgradeAsh Handling System Refinery Expansion, OSBL Piping & Pipe Rack ModificationsGas Purification Study and System Upgrade Limestone Crusher Flare InstrumentationInstrumentation for Refinery FlaresArc Flash RemediationFlare ComplianceMSATAtmospheric Relief ValvesBenzene NESHAP Compliance Improvement (BNCI)Flare Gas MonitoringAtmospheric PSVs to Flare SystemSat Gas OptimizationCrude Column RevampNatural Gasoline Processing StudyCrude Unit StudyPenex Heater ReplacementGas Oil Hydrobon Naphtha HydrotreaterDelayed Coker ExpansionHeater Boiler NOx Emissions ReductionGrassroots Utica Shale Crude Unloading TerminalCoker Heater Replacement