New Coffee Creamer Production Line

Food & Beverage

C&I provided definition and detailed design engineering to assist in the installation of a new coffee creamer production line within the existing facility. Our team was able to think creatively to optimize existing equipment and come in with new ideas on repurposing old systems for new processes. We also conducted a study on the cream system modifications so that the turbulence and higher velocities would not churn the cream into butter during the process.

Scope included design of the following:

  • Powder handling system
  • Liquefier for powder addition
  • Liquid/paste ingredient batching systems
  • Dust collection system
  • Batching tank liquid cooler
  • CIP supply pump to clean batching tanks
  • Automatic mix proof valve manifold
  • Modifications to existing batching tanks
  • Recommissioning of existing sugar storage/supply system