Distillery Equipment Relocation

Distilled Spirits

For this project, our team was able to facilitate the distillery’s expansion of their touring facilities by relocating the fermenter pump. By tucking it behind a column, we achieved optimal tour route that provided the most aesthetically pleasing result for tourist experience. Our challenge was to ensure easy access for maintenance of the pump while providing adequate space to pull the mash cooler bundle for cleaning.

In order to take advantage of a planned outage, we produced a quick retrofit design that addressed all concerns and required considerations. Our comprehensive design allowed the relocation to be conducted efficiently during the outage, avoiding delays.