C&I Engineering

  • Home
  • Contact
LINKEDIN
  • Industries
  • Solutions
  • Our Work
    • Case Studies
    • Projects
  • Careers
    • Learn About Key Roles
    • Company Culture
    • Search and Apply
  • About Us
    • Get to Know C&I
    • Give Back
    • News and Events
Contact LinkedIn
MENU
C&I Engineering
  • Industries
  • Solutions
  • Our Work
    • Case Studies
    • Projects
  • Careers
    • Learn About Key Roles
    • Company Culture
    • Search and Apply
  • About Us
    • Get to Know C&I
    • Give Back
    • News and Events

Grassroots Utica Shale Crude Unloading Terminal

Location of Project:Midwest

Project Cost :$15 million

Share

Quickly access crude produced from Utica shale via truck

A two-phase project with an aggressive schedule, the Utica crude unloading facility consisted of C&I front-end engineering, detail design, scheduling, procurement, and construction management. We developed the fully automated, round-the-clock crude unit to daily process 50 trucks carrying either crude oil or condensate, for a maximum capacity of 30,000 bbl/day. Our team performed all necessary surveying, site work, stormwater retention, purchasing, and contract awards for the grassroots facility.

We also redesigned the client’s original plans for a modular, mobile system to a stick-built design, while devising a unique way to make unloading faster with decreased cavitation. C&I employees remained on the project during startup to provide assistance, attending client-run technical advisory group meetings to offer ideas and answer questions.

Contact Us

Connect with C&I to hear how we provide our clients with personalized service and custom solutions.
Connect

Related Case Studies and Projects

C&I handiwork can be found all over the country.

Crude Railcar Flexibility

This project installed facilities to enable offload crude oil transported to the refinery by railcar.

View Project

Grassroots Chemical Plant

For this ISBL chemical facility, C&I provided process technology and complete engineering from concept to design.

View Project

Tight Oil Condensate Processing Design

We designed new facilities to receive and distribute product streams produced from tight oil.

View Project

Crude Column Revamp

C&I modified the diesel, AGO wash, and stripping sections of a 1C-1 Atmospheric Tower.

View Project

TOP
Home > Our Work > Grassroots Utica Shale Crude Unloading Terminal
  • Home
  • Industries
  • Solutions
  • Our Work
  • Careers
  • About Us
C&I Engineering
Call Us NowEmail Us Now LinkedIn

© 2021 C&I Engineering    Terms of Use | Privacy Policy