This project tapped the full breadth of our capability.
C&I provided the FEED, Detailed Design and Procurement for this extensive multi-disciplined Coker Renovation project. Our involvement included process, mechanical, civil/structural, electrical, plant design, scheduling and estimating, procurement and project management. A sampling of the scope: Coke Drum Interlocks,
DeltaValve Unheading Valves, Sewer Upgrades, Lighting, Coke Car Thermal Imaging, EIV’s, Hot Pumps Seals, Coker Safety Improvements, and Fire Suppression/Fighting System. This was the first coker project to have a total of ten (10) valves installed during a single shutdown, 5 – 40 ton valves on the lower heads and 5 – 6 ton valves on the upper heads.