Louisville Terminal Dock Barge Upgrade
Completion Date
6/2002
Services
Mechanical
Plant Design
Civil / Structural
Electrical
Construction Management
Industry
Location
KY
Increase the capacity of the River Dock by adding a third barge load/unload position, details include: vapor recovery unit – John Zink Unit add second run to unit, rework vapor recovery piping for three barges, add third product header including valves, barge mooring hardware and hose lifting hardware, lighting.