Electrical Infrastructure Upgrade
Completion Date
2003
Services
Electrical
Industry
Refining & Chemical
Location
Mid-West
C&I assisted in the refnery's 6.5MM expansion by escalating an existing Substation and a 13.8 kV Switchgear building. A 2.4 kV Switchgear building was installed at the revamped unit to support new loads as well as feed existing loads.