HD-5 Propane Recovery
Completion Date
1999
Services
Process
Mechanical
Plant Design
Scheduling Estimating
Civil / Structural
Electrical
Project Management
Procurement
Construction Management
Industry
Refining & Chemical
Location
Trainer, PA
The HD-5 project encompassed an all out process design effort within a compressed schedule. C&I revised the original ISBL processing scheme saving an estimated 5MM - altering the fractionation controls and treating section. C&I's new processing scheme left the existing Depropanizer in its original service. A new high pressure Deethanizer, that used chilled cooling water instead of a propane refrigeration system, would be installed. A preflash of the condensed and chilled Debutanizer off gas product reduced the C2 and lighter content of the Deethanizer feed allowing an even greater C3 plus recovery using only the chilled water.