Underground Piping Project
Completion Date
6/2006
Services
Civil / Structural
Industry
Refining & Chemical
Location
Mid-South
As part of a comprehensive Feasibility, FEED & Detail Design for this low sulfur diesel hydrotreater project, C&I designed a complete drainage system to isolate oily water from storm water. This system is unique in that it incorporates a leak detection system. The multiple pipe system incorporates numerous test points to check for leaks in the oily water sewer system. C&I was requested to incorporate the dual layer trench drain design in anticipation of future regulatory constraints.