Welcome to C&I:   Engineering, Procurement and Total Project Management

Underground Piping Project

Completion Date

6/2006

Services

Civil / Structural

Industry

Refining & Chemical

Location

Mid-South

As part of a comprehensive Feasibility, FEED & Detail Design for this low sulfur diesel hydrotreater project, C&I designed a complete drainage system to isolate oily water from storm water. This system is unique in that it incorporates a leak detection system. The multiple pipe system incorporates numerous test points to check for leaks in the oily water sewer system. C&I was requested to incorporate the dual layer trench drain design in anticipation of future regulatory constraints.