Welcome to C&I:   Engineering, Procurement and Total Project Management

Refinery Conceptual Studies

Completion Date

11/15/05

Services

Process
Mechanical
Scheduling Estimating
Project Management

Industry

Refining & Chemical

Location

Mid-South

C&I performed numerous conceptual studies of a +0/-50% magnitude to identified future projects designed to increase refinery thru put and eliminate bottlenecks. The studies ascertained each potential project?s future viability. The studies centered on the Fluid Catalytic Cracker unit. Specifics included the; cat cooler/O2 enrichment, amine regenerator, FCC slurry stream stripper, CGHT stabilizer, SGP DIB recycle pump, and crude blending.